Dagu River Management Office Three Management Station Office Building Project

The Dagu River management office building was built in 2017. The project includes a number of independent light steel buildings, and the exterior walls of the buildings are wood-plastic hanging panels. Planning and design: Determine the use and function of the light steel management building, and carry out planning and design. This includes determining the layout, dimensions, structure, etc. of the building.

Material procurement: According to the design requirements, purchase the materials required for the light steel structure, including steel, connectors, insulation materials, etc.

Construction preparation: Prepare the equipment and personnel required for construction, including lifting equipment, welding equipment, construction personnel, etc.

Foundation construction: Carry out foundation construction according to design requirements, including foundation excavation, foundation pouring, etc.

Light steel structure installation: assemble the prefabricated light steel structure, including columns, beams, walls, etc. Usually welded or bolted.

Exterior wall construction: Exterior wall construction is carried out on the outside of the light steel structure, including heat preservation, waterproofing, decoration, etc.

Roof construction: install the roof of light steel structure, including roof panels, waterproof layers, etc.

Interior decoration: carry out interior decoration, including floor laying, wall decoration, ceiling installation, etc.

Installation of system facilities: installation of electrical, water supply and drainage, air conditioning and other system facilities.

Completion acceptance: After the construction is completed, the completion acceptance shall be carried out to ensure that the light steel management room meets the design requirements and relevant standards.